Skip to main content

Contact Us for International Inquiries

For export, sourcing, or partnership inquiries, we are here to help.

Send Us a Message

Step 1 / 333%

Basic Contact Information

Contact Information

Fax

+886 6 2422920

Business Hours

Monday - Friday: 08:00 - 17:00 (Taiwan Time)

FAQ

The questions buyers ask most before starting a project with us.

1What information should I send for a metal-to-plastic feasibility review or quote?

The following helps us respond faster:

  • 3D CAD files
  • Estimated annual usage (EAU) and batch size
  • Operating environment (temperature, chemicals, load)
  • Target material

Send details to sales.wc@shplastics.com. We typically reply within 1–2 business days.

2Which engineering plastics can you support for structural or industrial parts?

Common high-performance routes include PPS+GF, PA66+GF, PEI, and POM for structural or heat-adjacent applications. Final material selection depends on load, temperature, chemical exposure, and volume.

3How long does development take from DFM approval to first molded samples?

After a 30% deposit and confirmed DFM, first trial shots (T1) typically take 40–90 calendar days depending on mold complexity. If T1 requires changes, a second trial (T2) is usually completed within about 10 working days. Mass production scheduling is confirmed once samples are approved.